We provided progressive engineer-procure-construct (EPC) services for the development of a greenfield natural gas meter station and pipeline with a capacity of 2.5 billion cubic feet per day (BCFD).
The schedule-driven project supported efforts to supply additional natural gas to Cheniere Energy’s Corpus Christi Liquefaction (CCL) Stage 3 facility. Our team was engaged from the front-end engineering design (FEED) stage through commissioning and final completion.
The meter station project included filtration, metering, flow control, a 36-inch jumper line to the existing CCL meter station, and an electronic gas management (EGM) building. It also included a half-mile, 48-inch interplant pipeline to the CCL stage 3 LNG facility, including pig launcher and receiver. The new meter station is adjacent to the existing CCL meter station, constraining the construction and siting footprint.
Client
Cheniere Energy
Location
Gregory, Texas
Region
Southwest
Services
Industry